Refurbishment - The Source FM

The Source FM refurbishment and internal fit out projects.

 

We have extensive experience to deliver Commercial, industrial and residential fit outs here are some projects we have delivered in the last 2 years.

          Commercial

 

  • Wholefoods – A value added internal fit out incorporating 3 Phase electrical, Data,  Refrigeration, Plant room, BMS, decoration, Structural works, fire alarm and Plumbing and gas, creating a facility for wholefoods to pack and prepare produce for all UK stores.

         Project timescale –  12 Weeks

          Project managed and delivered on time by the Source FM.

  • Hello Fresh – Office space fit out incorporating 3 Phase electrical, Data, Carpentry, Dry lining, Decoration and fire alarm works.

          Project timescale –  1 Weeks

         Project managed and delivered on time by the Source FM.

  • Waitrose demonstration Farm – Commercial Kitchen fit out including carpentry, 3 phase electrical and mechanical works, data, plumbing and decorating

         Project timescale –  4 Weeks

          Project managed and delivered on time by the Source FM.

  • Stubbins Food partnerships – Accommodation block refurbishment to 24 Rooms and all communal areas, Carpentry, electrical, multiple bathrooms, Kitchenettes and all plumbing works.

          Project timescale –  8 Weeks

          Project managed and delivered on time by the Source FM.

  • Waitrose demonstration Farm – Board room internal fit out, 3 phase Electrical works, dry lining, kitchenette, decoration, tiling, Carpentry, structural works, Document M Toilet and carpet fitting.

          Project timescale –  4 Weeks

          Project managed and delivered on time by the Source FM.

  • London Quality foods – Dilapidated warehouse 10,000 SQF Space with Mezzanine Floor, Demolition including removal of mezzanine Floor, complete 3 Phase electrical works including all lighting, power and containment  to feed 4000 square foot walk in freezer and 3000 square foot walk in fridge and pack house area, roof repairs, gutter and downpipe replacement, steel cladding to the side of the building, brickwork, CCTV, plumbing works, fridge panels for the freezer and fridge areas and all mechanical works associated, structural steels for artic lorry loading bay, all concreting works for loading bay and power floated floor in Fridges and freezers, rear brick extension for pack house area.

         Project timescale –  12 Weeks

         Project managed and delivered on time by the Source FM.

  • Project management services for Stubbins food partnerships – Pack house extension to front of an existing packhouse, drawings and planning permission gained for a 20,000 Square foot extension to facilitate moving packing from Stubbins main distribution centre to their onsite nurseries.

          Project managed and delivered on time by the Source FM.

  • Thread online – Relocation of distribution centre from White chapel to Hackey wick, building regs consultancy, 3 phase electrical design and installation for packing stations, Demolition, flooring installation and floor painting to main warehouse, data works, fire alarm design and installation, CCTV, Plumbing works, service and remedial works to Emergency exit doors, Emergency lighting design and installation, redecoration, carpentry works.

           Project timescale –  4 Weeks

           Project managed and delivered on time by the Source FM.

          Residential

 

  • N1- Full house refurbishment and 25 Square metre extension to the rear of the property, drawings, plans, building regs and party wall agreements, full design and installation of Electrical system, carpentry, full design and installation of heating system, structural works, garden design and installation of bespoke cedar fencing, joinery, carpets, Builders clean, all bathrooms and kitchens, tiling and  decoration.

          Project timescale –  26 Weeks

          Project managed and delivered on time by the Source FM.

  • E17– Full house refurbishment, bespoke joinery works, electrical installation works, full redecoration, replacement staircase and bannister, carpeting and new floors throughout.

          Project timescale –  4 Weeks

          Project managed and delivered on time by the Source FM.

  • Epping Copped hall estate New Build- period property restoration and sympathetic new build to a 16th century gatehouse using construction methods to ensure a perfect match to the existing house, demolition works to existing outhouses, relocation of mains services, sourcing and laying matching imperial red bricks, matching external brick arches, restoring existing brickwork and mortar with Lime mortar, installing bespoke hard wood external doors, electrical installation, external and internal lighting systems, roofing works for main property and new property, replacement windows for main property and new property, external decorative hardwood timber and render detail to the top half of the new build house and restoration of the existing and internal fit out works.

           Project timescale –  24 Weeks

          Project managed and site management delivered on time by the Source FM.

 

 

 

 

 

 

 

 

For further information or to discuss your Hard Facilities needs, please contact us